Metro Connect USA 2024
Feb 26th-28th, 2024 in Ft. Lauderdale, FL
About the Panel:
Increasing power density driven by evolving workloads, shrinking processors and the proliferation of GPUs are altering the requirements for new data centres and necessitating retrofitting of old sites. Combined with a growing ESG imperative, operators are faced with a considerable challenge. This session will discuss:
- Will the availability of power and sustainable power impact the development of new data centers?
- How are evolving compute requirements, driven by AI, AVs, 5G and IoT, changing data centre design?
- Does increasing power densification challenge the timeframe for adopting immersion cooling and other advanced technologies?